Link to CCU Home Page
Link to Quick Links
Link to Search Link to CCU Home Page
Facilities Planning and Management
image for decoration
 
Return to Bids/Architectural Selection
SE-310 Invitation For Construction Bids

Project Name: Atheneum Hall Renovations
Project Number: H17-9554-AC-
Project Location: Coastal Carolina University, Conway
Bid Security Required: Yes
Performance Bond Required: Yes
Payment Bond Required: Yes
Construction Cost Range: $2.1 - $2.3 Mil
 
Description of Project: Interior renovation and remodel of the existing 10,718 sf Atheneum Hall to include new mechanical, electrical & plumbing systems. The renovation includes removal of existing load bearing walls and replacing with steel structural columns and beams. The renovation will add office space with support meeting rooms and dining room.
 
A/E Name: The Boudreaux Group
A/E Contact: Chris Beard, AIA
Address: PO Box 5695
City: Columbia
State: SC
Zip: 29250
Phone: 803-799-0247
Fax: 803-771-6844
Email: cbeard@boudreauxgroup.com
 
Plans May Be Optained From: http://www.coastal.edu/administration/facilities/specs_plans_standards.html
Plan Deposit Amount: -0-
 
Pre-Bid Conference: Yes
Mandatory Attendance: No
Date: November 07, 2013
Time:10:00 AM
Place: Facilities 2 Conference Room
Bid Opening Date: November 26, 2013
Time: 2:00 PM
Place: Facilities 2 Conference Room
 
Name of Agency Coordinator: Rein Mungo
Title of Agency Coordinator: Director, University Projects & Planning
Agency Phone: 843-349-2577
Agency Fax: 843-349-2182
Agency Email: tmungo@coastal.edu
Link to CCU Home Page
University Policies | Site Policies | Contact Us
© 2014 Coastal Carolina University | P.O. Box 261954, Conway, SC 29528-6054 | +1 843-347-3161