Coastal Now Menu

Significant change coming to Chanticleer Drive

During the Christmas holiday break, two cul-de-sacs will be installed on Chanticleer Drive. One will be installed near the HTC pond between Brittain Hall and the Wall Building. The other will be installed close to the existing location of the bus stop at the Wall Building and The Woods Pavilion. For possible emergency situations, gates that can be activated to open if emergency vehicles need to pass into the area will be installed inside the cul-de-sacs. There will be no daily vehicular traffic in the area between the gates after construction is complete. This will allow students/faculty/staff/visitors to walk freely through this area.

The rendering will give you an idea of the placement of the cul-de-sacs. Faculty/staff will still have access to the gated lots near the Brittain and Wall buildings.

Faculty and staff may address questions to the “Faculty & Staff Online Forum”: http://connect.coastal.edu/.

Alternatively, questions may be addressed to:

Ralph Byington: byington@coastal.edu
Stacie Bowie: sbowie@coastal.edu
Debbie Conner: dconner@coastal.edu

You will recall that the intent in the master plan was to create a “pedestrian-friendly campus.” This is one of the additional initiatives meant to move the campus in that direction. The construction during the holiday break should create the least amount of disruption for the campus community.
 

Article Photos